Africa is building.
We engineer what endures.
The bridges that connect cities. The towers that define skylines. The infrastructure that outlasts generations. Blackbrick is the firm that builds it right and stays accountable long after the last handover.
Built on record, not on promise.
From school renovations in Accra to power plant works in Mozambique - 15 projects across education, energy, oil and gas, and real estate.
Facelift Al-Waleed Comprehensive School
CompletedA CRS initiative by Hollard Ghana, giving the early child development department a complete facelift.
Construction of Ultra Modern School
CompletedSchool facility and ancillary works for Rising Academies Network, Ayigbe Town, Weija.
Steel Fabrication & Pipeline Works
CompletedA portfolio of steel fabrication and pipeline works for energy and industrial clients across Ghana, Mozambique and Ivory Coast.
Built on the belief that engineering has no ceiling.
One firm. Full accountability. From the first drawing to the day after handover.
From the material to the monument.
Blackbrick's story does not begin on a construction site. It begins with the decisions that determine whether a structure will last - the specifications, the sourcing, the sequencing - made long before ground is broken. We were founded on an understanding of Ghana's built environment at its most fundamental level: what holds structures together, and what makes them endure.
That understanding shapes how we see construction. We treat procurement not as a paperwork exercise but as an engineering discipline. We recognise the decisions that quietly determine whether a project succeeds long before ground is broken. We know what materials can bear, and where the industry's real gaps lie - not just between phases, but between what is specified and what is actually delivered.
That is why Blackbrick operates as a full EPC+A contractor. We bring the same rigour to every phase of design, procurement and construction - and add something the industry was missing: one firm, fully accountable, from the first drawing to the day after handover. No handoffs. No ambiguity. No gaps.
Assured
We say what we mean about cost, time and scope, and hold to it.
Considered
Every design decision accounts for how it will actually be built on site.
Accountable
One firm, one point of responsibility, from drawing to handover.
Present
We remain involved after handover, not just during construction.
Board of Directors.
The board provides strategic oversight, governance and accountability across all of Blackbrick's operations and commitments.
William Aye-Addo
The team behind the work.
A senior leadership team combining decades of engineering, construction, commercial and financial experience across Ghana and beyond.
Read profile
Harold Tetteh Caesar
Read profile
Martin Glover Ayeh-Addo III
Read profile
Ing. Nathaniel M.K. Agbelie
Limitless engineering
means one team. Every phase.
Engineering, Procurement, Construction. Three phases, one firm, no gaps.
Engineering, Procurement, Construction. Three phases, one firm, no gaps.
Our services.
From the first drawing to the finished structure, Blackbrick delivers across the full spectrum of built environment disciplines.
Civil & Infrastructure Construction
Design Services
MEP Engineering
Coastal Engineering
Steel Works & Fabrication
Procurement, Material Supply & Logistics
Plant Pooling
Labour & Workforce Supply
Project Management
Cost Management
Construction Management
Quality Control & Assurance
Work in progress,
and work delivered.
15 projects across education, power, oil and gas, industrial, infrastructure and real estate - from Accra to Mozambique and Ivory Coast.
Facelift Al-Waleed Comprehensive School
CompletedA CRS initiative by Hollard Ghana, giving the early child development department a complete facelift.
Construction of Ultra Modern School
CompletedSchool facility and ancillary works for Rising Academies Network, Ayigbe Town, Weija.
Steel Fabrication & Pipeline Works
CompletedA portfolio of steel fabrication and pipeline works for energy and industrial clients across Ghana, Mozambique and Ivory Coast.
Completed projects
| # | Project | Client | Location | Sector |
|---|---|---|---|---|
| 01 | Renovation of 5 School Blocks | Rising Academies Network | Weija, Accra | Education |
| 02 | Construction of Ultra-Modern School Block with Recreational Amenities | Rising Academies Network | Ayigbe Town, Weija | Education |
| 03 | Renovation of 5 Kindergarten Classroom Blocks, Al-Waleed Comprehensive School | Hollard Ghana Limited | Nima, Accra | Education |
| 04 | Outdoor Event Centre | Confidential | Emefs Estate, Lashibi | Construction |
| 05 | Civil Works, Offankor-Pokuase Road Project | MEP Limited | Accra | Infrastructure |
| 06 | AKSA 350MW Power Plant, Boiler Installation & Chrome Pipe Welding | AKSA Enerji | Ghana | Power & Energy |
| 07 | Prestea Gas Conditioning Plant, Carbon Steel Pipeline Works | Genser Energy | Prestea, Ghana | Power & Energy |
| 08 | Cargill Water Treatment Plant, Stainless Steel Pipeline Installation | Orsam Ltd | Tema, Ghana | Industrial |
| 09 | Temane 450MW Power Plant, Gas & Steam Pipeline Fabrication | KSA Electric | Mozambique | Power & Energy |
| 10 | Tullow Oil Suction Pile, Offshore High Carbon Steel Welding | Harlequin Oil & Gas | Offshore, Ghana | Oil & Gas |
| 11 | Saipem Offshore & Onshore Gas Pipeline, 30km Welding Works | Kuyo Pipeline | Ivory Coast | Oil & Gas |
| 12 | Tema-Takoradi Interconnection Pipeline | Saipem Ghana | Takoradi, Ghana | Oil & Gas |
Start a conversation.
Whether you're at the earliest stage of a project or looking for a contractor to take over from where another left off, we're happy to talk through what's involved.
Airport Residential Area
Accra, Ghana
TDC Industrial Area
Tema Community 20, Ghana
Saturday: 9:00am – 1:00pm
Responsible delivery,
without exception.
At Blackbrick, health, safety, environmental stewardship and community accountability are not compliance requirements - they are the standard against which every project is measured, from mobilisation to handover and beyond.
Health & Safety
Zero-harm is our baseline, not an aspiration. We operate robust HSSE management systems across all project types - from civil and structural construction to steel fabrication, pipeline works and energy infrastructure. Every person who sets foot on a Blackbrick site is covered by documented safe systems of work, site-specific risk assessments and trained supervision.
Environmental Stewardship
We identify, assess and mitigate environmental risk on every project before a single mobilisation decision is made. Waste management, water use, emissions, land disturbance and biodiversity impact are tracked throughout the project lifecycle. In extractive and energy environments, we apply enhanced environmental controls aligned with international lender and operator requirements.
Community & Social Value
We are accountable to the communities in which we operate. Our projects prioritise local employment and skills development, source from regional supply chains wherever possible, and engage meaningfully with host communities from project outset. Social value is not a box we tick - it is a direct measure of how well we have done our job.
Health, Safety, Security & Environment Policy
Blackbrick Limited is committed to delivering every project to the highest standards of health, safety, security and environmental performance. The following principles govern our conduct on every site and in every jurisdiction in which we operate - including construction, energy, petroleum, mining and extractive industry environments.
-
01
Zero Harm Commitment We will not commence or continue any activity where risks to personnel, the public or the environment cannot be adequately controlled. The safety of people is never traded against programme or cost.
-
02
Risk Assessment Before Every Task All works are preceded by documented risk assessments, method statements and job hazard analyses. In high-risk environments such as pipelines, confined spaces, hot work and heavy lift operations, formal permit-to-work systems are mandatory.
-
03
Incident Reporting & Learning All incidents, near-misses and unsafe conditions are reported without exception and investigated to root cause. Lessons are shared across the project and the business. We will never suppress or minimise a safety event.
-
04
Competent Personnel Only No person is placed in a role for which they are not trained and certified. Competence records are maintained for all site personnel. In specialised trades - welding, electrical, rigging, explosives - only licensed operatives are deployed.
-
05
Environmental Impact Management Environmental aspects are assessed at project inception and reviewed at each phase gate. Spill prevention, containment and response plans are in place wherever hazardous materials, hydrocarbons or chemicals are present on site.
-
06
Community & Stakeholder Engagement We engage host communities before mobilisation and maintain transparent communication throughout construction. Grievance mechanisms are established and accessible. Any community impact - noise, dust, access disruption - is documented and managed proactively.
-
07
Continuous Improvement Our HSSE performance is audited, measured against targets and reviewed by leadership on a regular basis. We are committed to improving our systems year on year, benchmarked against international industry standards.
Ready for extractive
and energy environments.
Blackbrick is actively positioning to serve the mining, petroleum and extractive industries across West Africa - environments that demand the highest levels of HSSE discipline, environmental accountability and technical precision.
Our team brings direct experience in oil and gas pipeline works, power plant installations and heavy industrial fabrication. We understand the regulatory frameworks, international lender requirements and operator standards that govern projects in these sectors - and we build our management systems accordingly.